Work on Dave’s finca in Mallorca is moving into another important phase. After previous chapters focused mainly on the building structure and the basic construction work, attention now turns to the technical installations.
Edwin and his team are responsible for a major part of this work, covering everything from electricity and fresh water to wastewater, air conditioning and heat pumps. At the same time, Dave is thinking about the details that will eventually make the house comfortable and practical to live in.
How should the technology work in everyday life? What possibilities does a smart home system offer? Could one of the old water cisterns be used for something completely different? And what happens when the main generator suddenly stops working in the middle of the construction phase?
Chapter 9 shows just how many different aspects come together during a major renovation – and how some of the most interesting ideas can emerge while the work is already underway.
Before the actual cables can be installed, the team begins with an important preparatory step: laying the conduits.
These tubes will later carry the individual electrical cables throughout the house. A separate conduit is provided for each cable. Some of them have already been covered with plaster to protect them from being crushed or damaged as people move around the site or wheelbarrows pass over them.
This preparation is about more than simply keeping the wiring organised. It also leaves room for future adjustments. If an additional cable is needed at a later stage, it may be possible to feed it through one of the conduits that has already been installed.
The installation plan aims to provide plenty of connection points throughout the property. Alongside conventional electrical outlets, network connections are also an important part of the project.
Dave wants LAN connections available in as many areas as possible – including the guest rooms and even some rather unusual locations.
Connections are also being prepared around the kitchen and the future kitchen island. Another practical feature is the use of floor outlets. These make it possible to connect devices around the dining table or kitchen island without having to run cables across the room to a wall socket.
The original plan actually included even more electrical outlets. However, after discussing the layout with the installation team, Dave was advised to reduce the number. The result is still a generous supply of connections without placing a socket practically every few centimetres.
One of the key features planned for the house is a smart home system based on KNX technology.
In simple terms, KNX works a little like the nervous system of a building. With a conventional electrical installation, a switch is directly connected to a particular light. Pressing that switch always controls the same light.
With KNX, the individual connections are linked to a central control system. A button simply sends a signal that it has been pressed. The central programming then determines what happens next.
This means that a switch could control the lighting today and be assigned to a completely different function later, such as operating the blinds. The programming can be changed without having to alter the wiring itself.
This flexibility creates plenty of possibilities for the future use of the house.
There is one thing Dave feels particularly strongly about: a smart home should make everyday life easier, not turn simple tasks into complicated routines.
A light switch should still work intuitively. Lights on, lights off – without unnecessary flashing displays or confusing controls.
One feature Dave is especially looking forward to is a central switch near the entrance. By pressing and holding it, several functions could be activated at once when leaving the house:
All of this could happen with a single action.
Another major advantage is that the functions can be adjusted later. This allows the system to adapt to the residents‘ actual habits rather than requiring every detail to be decided permanently from the beginning.
As the installation work progresses, the team receives some additional support. Work has temporarily stopped at another construction site, and Dave is asked whether a few of the workers could help out on his project.
For Dave, this is an opportunity to get even more done.
However, with Mallorca’s summer temperatures, having enough workers is only part of the equation. Keeping everyone supplied with water and refreshments is just as important.
After already buying around 150 litres of water, Dave decides to organise an even larger supply this time: approximately 225 litres of water, along with soft drinks for the team.
During the hottest hours around midday, the workers also take breaks in the shade.
These may seem like small organisational details, but they make a real difference on a construction site, particularly during the summer months.
Dave also takes the opportunity to answer a question that has come up repeatedly in previous videos: how is a project like this actually financed?
He explains that obtaining financing for a property in Spain through a German bank can be more complicated than financing a property in Germany. One of the main issues is the question of collateral.
With a conventional mortgage in Germany, the property being purchased can usually serve as security for the loan. When the property is located in Spain, German banks may not be able to use it as collateral in the same way.
Dave therefore chose a different approach. He had built up savings over several years and invested some of that money. He then used this investment as security with a German bank, allowing him to finance the project through an alternative arrangement.
The question of the project’s final cost is considerably more difficult.
Dave openly admits that the renovation has become much more expensive than he originally expected and planned for. However, he cannot yet give a final figure.
Several invoices from the different trades are still outstanding. The windows also have to be installed, and the house still needs to be furnished.
Only once all these costs have been accounted for will it be possible to calculate the actual total.
Dave explains that he significantly underestimated the financial side of the project. As the costs continue to rise, he has naturally started questioning some of the decisions made along the way.
It is a reminder of how quickly the financial side of a major renovation can change. When numerous trades and different areas of work overlap, decisions made during construction can have a considerable impact on the overall budget.
Security is another subject Dave addresses in this episode. Because the finca is relatively secluded, he wants to make sure the property is properly equipped.
He deliberately avoids revealing the details of the planned security system. However, he confirms that a comprehensive setup is being planned and that he feels comfortable with the solution.
A nearby neighbour also has a security system that can detect people approaching the access road from several hundred metres away.
Dave takes the opportunity to thank viewers who have respected his earlier request not to visit the property without permission. Since he addressed the issue in a previous video, nobody has turned up unexpectedly at the site.
For him, this makes it much easier to continue working on the project and sharing its progress online.
One of the most interesting parts of this episode is Dave’s reflection on everything he has learned so far.
When asked what he would do differently, he has quite a long list of things in mind.
First, he says he would have researched the property more thoroughly before buying it. More importantly, he would have waited until the entire renovation plan was finalised before starting the work.
This would have included coordinating all the different trades and areas of the project:
Looking back, Dave believes that better coordination from the beginning could have saved a considerable amount of money.
He also feels that having an experienced person on the owner’s side – someone who could look at the entire project from a practical construction perspective – might have helped avoid some unnecessary costs and decisions.
Despite these lessons, he remains happy with the property, the companies involved and the work completed so far. Nevertheless, the experience has shown him just how important thorough preparation is before a major renovation begins.
There is also visible progress outside the house.
Both the swimming pool and the new water cistern are being prepared with a blinding layer of concrete. This creates a clean, level base before the reinforcement steel is installed and the actual structural concrete slab is poured.
The two different levels of the pool are already becoming visible. The first section is designed as a shallower area where people can stand comfortably in the water. The second section is deeper and intended for swimming, including use of the counter-current system.
The aim is to create a pool that offers different ways to enjoy the water, from simply relaxing to swimming against the current.
Some viewers had asked why a new cistern was necessary when the property already had two older ones.
The main reason is uncertainty about whether the existing cisterns are watertight. One of them is located very close to the house and the planned terrace. Dave does not want to take the risk of water leaking from an old structure and seeping into the surrounding ground near the building.
The new cistern is therefore being positioned in a more central location on the property.
This could also prove useful in the future. If additional construction is approved after the current project has been completed and formally accepted, the new cistern could potentially supply both buildings.
For now, however, this remains a future possibility and would depend on the necessary planning permissions.
Perhaps the most unusual idea in this episode comes during an inspection of one of the old cisterns.
One of the existing cisterns appears to be watertight and is intended for use in connection with garden irrigation. The condition of the other one, located close to the house, is less certain.
Dave wants to find out whether this underground space could serve an entirely different purpose.
Armed with a ladder, a headlamp and a laser measuring device, he climbs down to inspect the cistern and determine its actual dimensions.
The space turns out to be considerably larger than expected. The depth to the main bottom is approximately 4.58 metres, while a deeper section in the centre reaches around 5 metres.
At its widest point near the bottom, the cistern measures approximately 3.5 metres across. Based on his measurements, Dave calculates that it originally held around 22.5 cubic metres of water – approximately 22,500 litres.
Another interesting discovery is the temperature inside. The space feels noticeably cooler than the area outside, which could make it suitable for storing items that benefit from a more stable, cooler environment.
Dave’s concept is anything but ordinary. Instead of simply sealing the space and leaving it unused, he is considering turning it into an underground storage area.
His idea involves installing a platform in the centre of the cistern that can move up and down. He imagines a kind of goods lift operated by a winch and a pulley system.
Storage shelves could then be installed around the platform. By moving the platform vertically, it would be possible to reach the different storage levels.
According to Dave’s own calculations, approximately 17.5 cubic metres of storage space could remain available after allowing for the platform and its supporting structure.
That would create a surprisingly large amount of additional storage space in an area that might otherwise remain unused.
As interesting as the idea sounds, there are still several important questions to resolve before anything can be built.
How can someone safely get out if the lift stops working? Can the space be kept completely dry? How can rainwater be prevented from entering? And will the temperature remain sufficiently cool during the hottest months of the year?
The structural feasibility also needs to be checked, and suitable specialists will have to be found to help develop the concept.
During the first measurement, the thermometer shows around 20 degrees Celsius. However, the cistern is still open at this point. Whether the temperature can be maintained once it is properly covered remains to be seen.
Using the space as a wine cellar is also being considered, but no final decision has been made. The technical, structural and safety requirements still need to be clarified.
The old cistern is not the only part of the house where Dave is looking for unusual solutions.
Inside the building, he is still exploring the idea of a large sliding wall that would allow certain rooms to be separated. Ideally, the wall would run continuously across the space while incorporating a door, so that people could still move between the rooms when the wall is closed.
Another idea involves a movable television unit. It would run along a track, move into a selected position and rotate through 360 degrees. When it is no longer needed there, it could simply be moved away again.
Both ideas require specialist expertise. Dave is therefore reaching out to companies that work with large sliding systems, movable TV modules or the conversion of old cisterns into usable underground spaces.
These individual features show that not every design challenge can be solved with standard products. Some ideas require specialists from different fields to work together and develop a solution from scratch.
Another subject that needs attention is drainage around the property.
Mallorca generally receives less frequent rainfall than many parts of Germany. However, when rain does arrive, it can be extremely heavy.
Parts of Dave’s property sit in a slight depression, with changes in the surrounding ground levels. He therefore wants to consider how rainwater could collect and where it should be directed.
Although some of the workers do not consider additional drainage necessary, Dave would prefer to install drainage channels in selected areas, particularly around the planned terrace. He also wants rain gutters to be included.
The exact solution will be discussed with the specialists. The aim is to take the characteristics of the plot into account and ensure that rainwater can be directed away from the house in a controlled way.
Alongside all the progress, the week also brings a serious problem: the main diesel generator on the property stops working.
With a peak output of 24 kW, it is an essential part of the construction site. Since the finca does not yet have a regular electricity supply, many of the ongoing activities depend on this generator.
Dave contacts a company in Palma that previously installed the machine. After several attempts to find help, a mechanic finally arrives to inspect and repair it.
Unfortunately, the repair is unsuccessful.
The problem is not limited to the lack of electricity. The water supply is affected as well. The property’s well is approximately 70 to 80 metres deep, and the pump needs sufficient power to bring the water up to the surface.
Without a functioning generator, the pump cannot operate as required. This means there is no reliable water supply for the site, making it difficult to continue certain tasks.
The situation could also affect the planned concrete work for the pool and the new cistern.
At the end of the week, it is still uncertain whether these works will be able to go ahead as scheduled.
Chapter 9 once again demonstrates how many different elements are involved in a major renovation project.
The electrical installations are getting underway, and the smart home concept is becoming more concrete. At the same time, new possibilities are emerging for the outdoor areas and the use of the existing structures on the property.
The old cistern could potentially become an unusual underground storage space. The pool and new water cistern are moving closer to their next construction stages. Meanwhile, the financial challenges and lessons learned so far highlight just how important thorough planning and coordination are.
And then there are the things that simply cannot be planned for: a broken generator can suddenly bring important parts of the entire construction site to a standstill.
Step by step, Dave’s finca is taking shape – with practical solutions, individual ideas and plenty of challenges still ahead.
The journey from a run-down house to a dream home in Mallorca continues.